> Coverage of this brief: open PJM rule-change items; open NERC rule-change items; recent FERC electric issuances; activity in your watched FERC dockets. Out of scope: NERC reliability-standard development and compliance deadlines, state commission dockets, committee actions not tied to a tracked rule-change item, markets you are not in (SPP, ERCOT, CAISO, MISO, ISONE, NYISO). Absence of an item here means it did not appear in the covered sources, not that nothing happened elsewhere.

228 items tracked this cycle across PJM and NERC and FERC. 98 touch your operations; the 8 below are the ones worth your time now. 130 were reviewed and set aside, each with its reason.

What matters most for you

FR-2026-15781 PJM Governance and Stakeholder Reforms; Notice Requesting Post-Conference Comment, changes the process behind the votes you hold at Members Committee. Comment by 2026-08-21.
2023-09 Risk Management for Third-Party Cloud Services, compliance obligation for your NERC-registered functions. Comment by 2026-08-21.
2022-05 Modifications to CIP-008 Reporting Threshold, compliance obligation for your NERC-registered functions. Comment by 2026-09-23.
2025-01 Canadian-Specific Revisions to EOP-012-3, compliance obligation for your NERC-registered functions. Comment by 2026-08-31.
FERC-ER26-3380-000 PJM Interconnection, L.L.C.: 205(d) Rate Filing: Reliability Backstop Procurement to Address Resource Adequacy and Large Loads to be effective 9/29/2026., you carry resource-adequacy obligations and cost as an LSE. Comment by 2026-08-21.
PJM-ISSUE-064A0B1B-AEDA-4F5B-87B8-82B5759FB6B5 Critical Issue Fast Path (CIFP) - Reliability Backstop Procurement, you carry resource-adequacy obligations and cost as an LSE. Next dated step: Presentation 2026-08-18.
PJM-ISSUE-2E32710D-634B-4925-84BF-1F56A33C7E05 Enhancements to Deactivation Rules, you carry resource-adequacy obligations and cost as an LSE. Next dated step: target completion 2026-08-19.
FERC-ER26-3256-000 PJM Interconnection, L.L.C.: Sec. 205(d) Rate Filing: Amendment to ISA, Service Agreement No. 6517; Queue No. AC1-167/AE2-322 to be effective 9/23/ 2026., a FERC proceeding in PJM, the market whose tariff you operate under. Comment by 2026-08-14.

Your vote & deadline watch

2026-08-14 · FERC-ER26-3256-000 PJM Interconnection, L.L.C.: Sec. 205(d) Rate Filing: Amendment to ISA, Service Agreement No. 6517; Queue No. AC1-167/AE2-322 to be effective 9/23/ 2026.
2026-08-14 · FERC-ER26-3269-000 PJM Interconnection, L.L.C.: Sec. 205(d) Rate Filing: Amendment to Amended GIA SA No. 7442; Project Identifier AE2-316/AF1-302 to be effective 9/23/2026.
2026-08-14 · FERC-ER26-3272-000 PJM Interconnection, L.L.C.: Sec. 205(d) Rate Filing: Amendment to GIA SA No. 7342; Project Identifier No. AF2-187 to be effective 9/23/2026.
2026-08-17 · FERC-ER26-3289-000 PJM Interconnection, L.L.C.: Tariff Amendment: Notice of Cancellation of ISA, Service Agreement No. 6436; AE2-224 to be effective 1/26/2026.
2026-08-17 · FERC-ER26-3293-000 PJM Interconnection, L.L.C.: Tariff Amendment: Notice of Cancellation of ISA, Service Agreement No. 6206; AE1-196 to be effective 1/8/2026.
2026-08-18 · FERC-ER26-3294-000 PJM Interconnection, L.L.C.: Sec. 205(d) Rate Filing: Revised Service Agreement No. 6258 re: NITSA among PJM and Wabash Valley to be effective 7/1/ 2026.
2026-08-20 · FERC-ER26-3335-000 PJM Interconnection, L.L.C.: 205(d) Rate Filing: Amendment to GIA, SA No. 7651; Project Identifier No. AF2-025 to be effective 9/29/2026.
2026-08-21 · FR-2026-15781 PJM Governance and Stakeholder Reforms; Notice Requesting Post-Conference Comment
2026-08-21 · NERC-2023-09 2023-09 Risk Management for Third-Party Cloud Services
2026-08-21 · FERC-ER26-3380-000 PJM Interconnection, L.L.C.: 205(d) Rate Filing: Reliability Backstop Procurement to Address Resource Adequacy and Large Loads to be effective 9/29/2026.
2026-08-26 · FERC-ER26-3430-000 PJM Interconnection, L.L.C.: Sec. 205(d) Rate Filing: Original NSA, SA No. 8039; Queue No. AF1-038 to be effective 10/5/2026.
2026-08-28 · FERC-ER26-3453-000 PJM Interconnection, L.L.C.: 205(d) Rate Filing: Original NSA, Service Agreement No. 8030; AE2-306/AF1-285 to be effective 10/7/2026.
2026-08-28 · FERC-ER26-3456-000 PJM Interconnection, L.L.C.: 205(d) Rate Filing: Amendment to GIA, SA No. 7895; Project Identifier No. AG1-410/AG1-411 to be effective 10/7/2026.
2026-08-28 · FERC-ER26-3460-000 PJM Interconnection, L.L.C.: 205(d) Rate Filing: Amendment to Service Agreement No. 7584; Project Identifier No. AG1-047 to be effective 10/7/2026.
2026-08-31 · NERC-2025-01 2025-01 Canadian-Specific Revisions to EOP-012-3
2026-09-23 · NERC-2022-05 2022-05 Modifications to CIP-008 Reporting Threshold

Coming up, dated but not a comment window

2026-08-18 · PJM-ISSUE-064A0B1B-AEDA-4F5B-87B8-82B5759FB6B5 Critical Issue Fast Path (CIFP) - Reliability Backstop Procurement, Presentation
2026-08-19 · PJM-ISSUE-2E32710D-634B-4925-84BF-1F56A33C7E05 Enhancements to Deactivation Rules, target completion
2026-08-19 · PJM-ISSUE-12019093-E93F-46FC-A55C-3D61C07CB99C Enhancements to the Cluster-Based Interim Deliverability Study Methodology, target completion
2026-08-19 · PJM-ISSUE-47C1F237-AD69-4695-8BA3-FF6CBAF9A037 Storage as a Transmission Asset - Phase II, target completion
2026-08-19 · PJM-ISSUE-D3FC15A8-6735-4808-B83E-A5002724476B Flexible Resource Lost Opportunity Costs Eligibility, target completion
2026-08-27 · PJM-ISSUE-D63CB446-6161-48CA-9BD5-83411C918ADA Powering Reliability Through Market Design, target completion
2026-09-24 · PJM-ISSUE-3D0129A5-EDA0-416C-9E32-944C6AB7BB10 Offer Verification Exception Request Timeline Definition, target completion
2026-10-28 · PJM-ISSUE-B435C39B-D4BB-4C3C-ADA9-8EFBC0E52246 Storage as a Transmission Asset, target completion
2026-10-28 · PJM-ISSUE-5A586FD0-2381-40C2-A593-15EADA18AD50 Reserve Certainty and Resource Flexibility Incentives, target completion
2026-10-28 · PJM-ISSUE-B61EA0E7-C8BD-46FB-9614-725834E7A78A Fuel Cost Policy Clarifications for Affiliated Fuel Suppliers, target completion
2026-10-30 · PJM-ISSUE-C736EB37-2B12-4250-A053-DD439C066F52 Dual Fuel Schedule Requirements, target completion
2026-12-16 · PJM-ISSUE-93900EB5-1665-49BE-B717-1049FC94B652 Resource Scheduling Prior to the Day Ahead Energy Market, target completion
and 2 more, in the tracker below.

In detail

FR-2026-15781 PJM Governance and Stakeholder Reforms; Notice Requesting Post-Conference Comment

Why this reaches you: changes the process behind the votes you hold at Members Committee; a FERC proceeding in PJM, the market whose tariff you operate under.

Status: published · Comment by: 2026-08-21 · At: FERC · source

2023-09 Risk Management for Third-Party Cloud Services

CIP-002-5.1a; CIP-002-8; CIP-003-10; CIP-003-11; CIP-003-9; CIP-004-7; CIP-004-8; CIP-005-7; CIP-005-8; CIP-006-6; CIP-007-6; CIP-008-6; CIP-009-6; CIP-010-4; CIP-010-5; CIP-011-3; CIP-012-2; CIP-013-2; CIP-013-3; CIP-014-3

Why this reaches you: compliance obligation for your NERC-registered functions.

Status: Active · Comment by: 2026-08-21 · source

2022-05 Modifications to CIP-008 Reporting Threshold

CIP-008-6

Why this reaches you: compliance obligation for your NERC-registered functions.

Status: Active · Comment by: 2026-09-23 · Next dated step: Formal Posting 1: Initial Ballots and No 2026-09-14 · source

2025-01 Canadian-Specific Revisions to EOP-012-3

EOP-012-3

Why this reaches you: compliance obligation for your NERC-registered functions.

Status: Active · Comment by: 2026-08-31 · Next dated step: next step 2026-08-31 · source

FERC-ER26-3380-000 PJM Interconnection, L.L.C.: 205(d) Rate Filing: Reliability Backstop Procurement to Address Resource Adequacy and Large Loads to be effective 9/29/2026.

205(d) Rate Filing: Reliability Backstop Procurement to Address Resource Adequacy and Large Loads to be effective 9/29/2026.

Why this reaches you: you carry resource-adequacy obligations and cost as an LSE; a FERC proceeding in PJM, the market whose tariff you operate under.

Status: published · Comment by: 2026-08-21 · At: FERC · source

PJM-ISSUE-064A0B1B-AEDA-4F5B-87B8-82B5759FB6B5 Critical Issue Fast Path (CIFP) - Reliability Backstop Procurement

Why this reaches you: you carry resource-adequacy obligations and cost as an LSE.

Status: Solution Alternatives Proposed · Next dated step: Presentation 2026-08-18 · At: Other · source

PJM-ISSUE-2E32710D-634B-4925-84BF-1F56A33C7E05 Enhancements to Deactivation Rules

Why this reaches you: you carry resource-adequacy obligations and cost as an LSE.

Status: Evaluation in Progress · Next dated step: target completion 2026-08-19 · At: MRC · source

FERC-ER26-3256-000 PJM Interconnection, L.L.C.: Sec. 205(d) Rate Filing: Amendment to ISA, Service Agreement No. 6517; Queue No. AC1-167/AE2-322 to be effective 9/23/ 2026.

Sec. 205(d) Rate Filing: Amendment to ISA, Service Agreement No. 6517; Queue No. AC1-167/AE2-322 to be effective 9/23/ 2026.

Why this reaches you: a FERC proceeding in PJM, the market whose tariff you operate under.

Status: published · Comment by: 2026-08-14 · At: FERC · source

Also on your list, 90 further items

ItemWhy it reaches youComment by
FERC-ER26-3269-000 PJM Interconnection, L.L.C.: Sec. 205(d) Rate Filing: Amend...a FERC proceeding in PJM, the market whose tariff you operate under2026-08-14
FERC-ER26-3272-000 PJM Interconnection, L.L.C.: Sec. 205(d) Rate Filing: Amend...a FERC proceeding in PJM, the market whose tariff you operate under2026-08-14
FERC-ER26-3289-000 PJM Interconnection, L.L.C.: Tariff Amendment: Notice of Ca...a FERC proceeding in PJM, the market whose tariff you operate under2026-08-17
FERC-ER26-3293-000 PJM Interconnection, L.L.C.: Tariff Amendment: Notice of Ca...a FERC proceeding in PJM, the market whose tariff you operate under2026-08-17
FERC-ER26-3294-000 PJM Interconnection, L.L.C.: Sec. 205(d) Rate Filing: Revis...a FERC proceeding in PJM, the market whose tariff you operate under2026-08-18
FERC-ER26-3335-000 PJM Interconnection, L.L.C.: 205(d) Rate Filing: Amendment ...a FERC proceeding in PJM, the market whose tariff you operate under2026-08-20
FERC-ER26-3430-000 PJM Interconnection, L.L.C.: Sec. 205(d) Rate Filing: Origi...a FERC proceeding in PJM, the market whose tariff you operate under2026-08-26
PJM-ISSUE-12019093-E93F-46FC-A55C-3D61C07CB99C Enhancements to the Cluster-Based Interim Deliverability St...shapes what you are directed to build and how it is evaluated
PJM-ISSUE-47C1F237-AD69-4695-8BA3-FF6CBAF9A037 Storage as a Transmission Asset - Phase IIshapes what you are directed to build and how it is evaluated
PJM-ISSUE-4D8D6A34-3B3A-4FEB-8BE6-7CD27D66F244 Sub-Annual Capacity Marketyou carry resource-adequacy obligations and cost as an LSE
PJM-ISSUE-D3FC15A8-6735-4808-B83E-A5002724476B Flexible Resource Lost Opportunity Costs Eligibilityaffects your market participation and bidding
PJM-ISSUE-D63CB446-6161-48CA-9BD5-83411C918ADA Powering Reliability Through Market Designaffects your market participation and bidding
PJM-ISSUE-18869E44-0F0A-4505-8DCF-33BBBDC51E17 Eliminating First Use for Interconnections to Distribution ...you host interconnection studies and the facilities they assign
PJM-ISSUE-23FC7FE8-F851-4A46-B2AA-33EA23B606B7 Expansion of Provisional Serviceyou host interconnection studies and the facilities they assign
PJM-ISSUE-ACF4C1CC-371A-48E8-A665-5E1CE539DFFE Enhancing Capacity Interconnection Rights (CIR) Transfer Ef...you host interconnection studies and the facilities they assign
PJM-ISSUE-C5BB612D-5342-4B56-850E-4E520E902EC6 Implementation of Connect and Manage Framework for Large Lo...you host interconnection studies and the facilities they assign
PJM-ISSUE-B435C39B-D4BB-4C3C-ADA9-8EFBC0E52246 Storage as a Transmission Assetshapes what you are directed to build and how it is evaluated
FERC-ER26-3453-000 PJM Interconnection, L.L.C.: 205(d) Rate Filing: Original N...a FERC proceeding in PJM, the market whose tariff you operate under2026-08-28
FERC-ER26-3456-000 PJM Interconnection, L.L.C.: 205(d) Rate Filing: Amendment ...a FERC proceeding in PJM, the market whose tariff you operate under2026-08-28
FERC-ER26-3460-000 PJM Interconnection, L.L.C.: 205(d) Rate Filing: Amendment ...a FERC proceeding in PJM, the market whose tariff you operate under2026-08-28
FR-2026-15779 PJM Interconnection, L.L.C.a FERC proceeding in PJM, the market whose tariff you operate under
FR-2026-16175 PJM Interconnection, L.L.C., AEP Appalachian Transmission C...a FERC proceeding in PJM, the market whose tariff you operate under
PJM-ISSUE-3322A887-69A9-4EBC-9DC5-69B9DA854F25 Schedule 2 Penalty Calculationstransmission/market cost is allocated to the load you serve
PJM-ISSUE-43906C5D-3715-4738-B934-F5BFB6CD1A3B Credit Risk Arising from Bilateral Capacity Transactionssets the credit and collateral you must post to participate
PJM-ISSUE-494E2C44-967C-4956-9D34-62A963558C12 Enhanced Know Your Customer (KYC)sets the credit and collateral you must post to participate
PJM-ISSUE-5091EE30-3FA2-4D29-A7FA-E08368048E17 Review of Minimum Capitalizations for Participation in PJM ...sets the credit and collateral you must post to participate
PJM-ISSUE-757A1369-64D0-4548-AE36-2F028B6D97DA Internal Network Integration Transmission (NITS) Processtransmission/market cost is allocated to the load you serve
PJM-ISSUE-7E4D5CB0-8418-4117-B6E0-1E20F48AA7B0 Local Considerations in the Net Cost of New Entrytransmission/market cost is allocated to the load you serve
PJM-ISSUE-8EB4AB52-39CF-46E0-8357-AC92369AAE36 Review of RPM Seller Credit Provision for Market Participantssets the credit and collateral you must post to participate
PJM-ISSUE-907B909A-A42A-4A91-96EC-8ACE41CBB3A9 Black Start Base Formula Ratetransmission/market cost is allocated to the load you serve
PJM-ISSUE-DE660F10-1A65-45DF-B8C9-275BB03646F7 Cost Allocation Issues Related to DOE Orderstransmission/market cost is allocated to the load you serve
PJM-ISSUE-ED290888-8D0C-47C2-A57A-B8130E3F7DAD RPM Credit Requirement for At-Risk Existing Resourcessets the credit and collateral you must post to participate
NERC-2020-06 2020-06 Verifications of Models and Data for Generators**applies to you as a generation owner
NERC-2023-07 2023-07 Transmission System Planning Performance Requiremen...compliance obligation for your NERC-registered functions
NERC-2024-02 2024-02 Planning Energy Assuranceyou carry resource-adequacy obligations and cost as an LSE
PJM-ISSUE-0A48AB03-08EE-4411-84EF-690798FA30CF PJM Energy Storage Resource Model Enhancementsaffects your market participation and bidding
PJM-ISSUE-3D0129A5-EDA0-416C-9E32-944C6AB7BB10 Offer Verification Exception Request Timeline Definitionaffects your market participation and bidding
PJM-ISSUE-5A586FD0-2381-40C2-A593-15EADA18AD50 Reserve Certainty and Resource Flexibility Incentivesaffects your market participation and bidding
PJM-ISSUE-93900EB5-1665-49BE-B717-1049FC94B652 Resource Scheduling Prior to the Day Ahead Energy Marketaffects your market participation and bidding
PJM-ISSUE-B61EA0E7-C8BD-46FB-9614-725834E7A78A Fuel Cost Policy Clarifications for Affiliated Fuel Suppliersaffects your market participation and bidding
PJM-ISSUE-C736EB37-2B12-4250-A053-DD439C066F52 Dual Fuel Schedule Requirementsaffects your market participation and bidding
FERC-20260811-3092 FERC Issuance 20260811-3092 in watched docket ER25-2438activity in a docket you are watching
NERC-2017-01 2017-01 Modifications to BAL-003 - Phase IIcompliance obligation for your NERC-registered functions
NERC-2019-04 2019-04 Modifications to PRC-005-6compliance obligation for your NERC-registered functions
NERC-2021-01 2021-01 System Model Validation with IBRs**compliance obligation for your NERC-registered functions
NERC-2021-02 2021-02 Modifications to VAR-002-4.1*compliance obligation for your NERC-registered functions
NERC-2021-03 2021-03 CIP-002compliance obligation for your NERC-registered functions
NERC-2021-08 2021-08 Modifications to FAC-008compliance obligation for your NERC-registered functions
NERC-2022-02 2022-02 Uniform Modeling Framework for IBR**compliance obligation for your NERC-registered functions
NERC-2022-04 2022-04 EMT Modeling*compliance obligation for your NERC-registered functions
NERC-2023-05 2023-05 Modifications to FAC-001 and FAC-002*compliance obligation for your NERC-registered functions
NERC-2023-08 2023-08 Modifications of MOD-031 Demand and Energy Data*compliance obligation for your NERC-registered functions
NERC-2025-03 2025-03 Order No. 901 Operational Studiescompliance obligation for your NERC-registered functions
NERC-2025-04 2025-04 Order No. 901 Planning Studiescompliance obligation for your NERC-registered functions
NERC-2025-05 2025-05 Ride-Through Revisionscompliance obligation for your NERC-registered functions
NERC-2025-06 2025-06 Supply Chain Risk Managementcompliance obligation for your NERC-registered functions
NERC-2026-01 2026-01 PRC-006 Standard Updatescompliance obligation for your NERC-registered functions
PJM-ISSUE-072FE76C-BF67-45AB-BEFD-B07612A733A7 Capacity Performance (CP) Non-Performance Penalty Stop Loss...you carry resource-adequacy obligations and cost as an LSE
PJM-ISSUE-4F434D95-1D5A-4CA2-B70B-75C6088AD888 Capacity Market Enhancements - CETLyou carry resource-adequacy obligations and cost as an LSE
PJM-ISSUE-741D6357-6641-4749-B5A0-BD05BEA612C5 Winter Storm Elliottyou carry resource-adequacy obligations and cost as an LSE
PJM-ISSUE-84493016-C572-4992-B7AB-B634E291D664 Capacity Market Enhancements - ELCC Accreditation Methodologyyou carry resource-adequacy obligations and cost as an LSE
PJM-ISSUE-8C0A4C8F-4868-44A2-A8BA-65B5777AA28B Updates for Control Center and Data Exchange Requirementscompliance obligation for your NERC-registered functions
PJM-ISSUE-B7F726E1-9F06-414E-8516-4D69B5050AF4 Fuel Requirements for Black Start Resourcescompliance obligation for your NERC-registered functions
PJM-ISSUE-D0505DAD-6DCA-43B3-9334-BD8ABA2A16E9 Capacity Market Reformyou carry resource-adequacy obligations and cost as an LSE
PJM-ISSUE-DEF9D9DF-9AD9-4242-BAA6-7D667F4A7A98 2025 Quadrennial Reviewyou carry resource-adequacy obligations and cost as an LSE
PJM-ISSUE-EBD2F231-890F-4376-B1C9-4D709BB395CF Long Term Regional Transmission Planningapplies to you as a transmission owner
PJM-ISSUE-65EAD8D9-51DD-49C1-8B7B-5E02FB8CB3C6 Critical Infrastructure Stakeholder Oversightchanges the process behind the votes you hold at Members Committee
PJM-ISSUE-6A31D832-FF39-4D36-B272-4364DB388061 Automating Bid Duration for Economic Demand Response Partic...affects how the load you serve participates in the market
PJM-ISSUE-6D847654-2C07-479A-8242-BCAF95BDC6C2 Load Management and Price Responsive Demand Event Performanceaffects how the load you serve participates in the market
PJM-ISSUE-87BDA68E-28C4-4E11-9832-D2AEBF3437E4 Interface Pricing for Non-Market Entitiesyou sit in more than one market, so a seams change reaches you from both sides
PJM-ISSUE-89549C13-1CCF-4F12-9EF0-C34C67021144 Manual 19: Attachment B Updateschanges the process behind the votes you hold at Members Committee
PJM-ISSUE-BD696C31-DDE6-47ED-9C76-71229864F573 DR Availability Windowaffects how the load you serve participates in the market
PJM-ISSUE-EE978709-84CA-4B45-BF55-BBD821B10D3B Interim Deliverability Study Adjustmentshapes what you are directed to build and how it is evaluated
PJM-ISSUE-FEA17F0E-DBB2-4BDB-B1C5-59174FB86A88 FERC Order 1920shapes what you are directed to build and how it is evaluated
PJM-ISSUE-9BB20484-4CA9-404A-8B03-47D65A28B28A Generation Self-Scheduling Market Rulesapplies to you as a generation owner
FR-2026-15977 Notice of Effectiveness of Exempt Wholesale Generator and F...applies to you as a generation owner
PJM-ISSUE-3423B18C-59C2-49DD-84C5-AF42B1BA0256 Solar-Battery Hybrid Resourcesaffects your market participation and bidding
PJM-ISSUE-3F1658D3-7EAE-4BBA-9633-B64E9F724E84 Regulation Market Designaffects your market participation and bidding
PJM-ISSUE-4FD636B1-DD58-4751-B5A7-69720A6AB19E Day Ahead Scheduling Reserve Calculationaffects your market participation and bidding
PJM-ISSUE-5D948BA3-8004-4D46-9945-27132A1CC41F Transparency in Performance Assessment Interval (PAI) Settl...affects your market participation and bidding
PJM-ISSUE-6897C7E7-D8B7-438E-9E3F-B6099F9DD7EC Capacity Offer Opportunities for Generation with Co-Located...applies to you as a generation owner
PJM-ISSUE-6A26A4E2-BED9-4D2F-84EF-166FD963EAEE FTR Market Residual Risk Managementaffects your market participation and bidding
PJM-ISSUE-83ECD740-296F-4A37-9C76-75D5876785FA Battery Dispatch Updateaffects your market participation and bidding
PJM-ISSUE-83FCE36D-AF05-4ED7-8231-EE8F41C74E0C ARR/FTR Market Reviewaffects your market participation and bidding
PJM-ISSUE-89F777A4-71A5-4898-8E08-432FC5EF9EBF Dual Fuel Capacity Definitionsaffects your market participation and bidding
PJM-ISSUE-9049C9D4-1DA7-43D0-BD6A-130D86D5922C Hybrid Resources Enhancements (Hybrids Phase 3)affects your market participation and bidding
PJM-ISSUE-BEEA7CEB-8033-4EE1-A54A-A4680C9357EC Wind and Solar Resource Dispatch in Real-time Market Cleari...affects your market participation and bidding
PJM-ISSUE-DEB6E5C9-0A1A-4DC2-BAB0-8EED6D2E91EE Performance Impact of multi-schedule model in Market Cleari...affects your market participation and bidding
PJM-ISSUE-E2CF01C5-2504-49D7-8B1A-66B867BBA081 Stability Limits in Markets and Operationsaffects your market participation and bidding
PJM-ISSUE-F9B3DBF5-4149-4EA6-9AD3-0C452FF9F386 Operating Reserve Clarification for Resources Operating as ...affects your market participation and bidding

Needs human review, could not be classified

These items carried no recognizable issue tags; a person should confirm they genuinely don't apply before this cycle closes.

• FR-2026-16436 Dauphin Island Gathering Partners; Notice of Application and Establishing Intervention Deadline, https://www.federalregister.gov/documents/2026/08/12/2026-16436/dauphin-island-gathering-partners-notice-of-application-and-establishing-intervention-deadline
• FR-2026-16422 Reliability Technical Conference; Supplemental Notice of Reliability Technical Conference, https://www.federalregister.gov/documents/2026/08/12/2026-16422/reliability-technical-conference-supplemental-notice-of-reliability-technical-conference
• FR-2026-16418 NorthWestern Corporation; Notice of Institution of Section 206 Proceeding and Refund Effective Date, https://www.federalregister.gov/documents/2026/08/12/2026-16418/northwestern-corporation-notice-of-institution-of-section-206-proceeding-and-refund-effective-date

Reviewed and set aside, and why

136, SPP item; you are not a member of that market. SPP-RR0808, SPP-RR0807, SPP-RR0806, SPP-RR0805, SPP-RR0804, SPP-RR0803, and 130 more
73, FERC item; you are not a member of that market. FERC-ER26-3458-000, FERC-ER26-3452-000, FERC-ER26-3454-000, FERC-ER26-3455-000, FERC-ER26-3447-000, FERC-ER26-3448-000, and 67 more
70, MISO item; you are not a member of that market. MISO-MSC-2019-2, MISO-MSC-2025-4, MISO-PAC-2024-2, MISO-LLWG-2024-4B, MISO-LLWG-2026-1, MISO-LLWG-2026-2, and 64 more
63, GB item; you are not a member of that market. GB-CMP288, GB-CMP304, GB-CMP305, GB-CMP315, GB-CMP328, GB-CMP330, and 57 more
57, AEMC item; you are not a member of that market. AEMC-ERC0293, AEMC-ERC0341, AEMC-ERC0342, AEMC-ERC0344, AEMC-ERC0345, AEMC-ERC0355, and 51 more
50, NYISO item; you are not a member of that market. NYISO-FILING5446, NYISO-FILING5444, NYISO-FILING5443, NYISO-FILING5442, NYISO-FILING5441, NYISO-FILING5438, and 44 more
47, AESO item; you are not a member of that market. AESO-CONSULTATION-iso-tariff-redesign-regulatory-consultation, AESO-CONSULTATION-2027-budget-development-process, AESO-CONSULTATION-development-of-proposed-amended-definition-of-inflexible-block-in-the-iso-rules, AESO-CONSULTATION-id-amendment-2012-006r-adequacy-supply-shortfall-and-energy-emergency-alerts, AESO-CONSULTATION-2026-long-term-outlook-plan, AESO-CONSULTATION-engagement-plan, and 41 more
44, DE item; you are not a member of that market. DE-GBK-26-01-1#1, DE-GBK-25-01-1#2, DE-GBK-25-01-1#3, DE-GBK-25-01-2#2, DE-GBK-24-01-3#3, DE-GBK-24-02-3#5, and 38 more
33, ERCOT item; you are not a member of that market. ERCOT-NPRR956, ERCOT-NPRR1214, ERCOT-NPRR1255, ERCOT-NPRR1272, ERCOT-NPRR1278, ERCOT-NPRR1286, and 27 more
26, no issue type maps to your roles (hydro_licensing). FR-2026-16431, FR-2026-16421, FR-2026-16327, FR-2026-16326, FR-2026-16325, FR-2026-16241, and 20 more
25, CAISO item; you are not a member of that market. CAISO-INITIATIVE-Billing-payment-credit-enhancements, CAISO-INITIATIVE-Commitment-Cost-Bidding-Flexibility, CAISO-INITIATIVE-Congestion-revenue-rights-enhancements, CAISO-INITIATIVE-Day-ahead-market-enhancements, CAISO-INITIATIVE-Day-ahead-sufficiency, CAISO-INITIATIVE-Demand-Distributed-Energy-Market-Integration, and 19 more
23, IESO item; you are not a member of that market. IESO-MRA493, IESO-MRA492, IESO-MRA491, IESO-MRA487, IESO-MRA490, IESO-MRA488, and 17 more
23, SEM item; you are not a member of that market. _SEM-Mod_03_26, SEM-Mod_02_26, SEM-Mod_01_26, SEM-Mod_05_25, SEM-Mod_04_25, SEM-Mod_01_25, and 17 more_
20, ISONE item; you are not a member of that market. ISONE-WMPP155, ISONE-WMPP166, ISONE-WMPP174, ISONE-WMPP181, ISONE-WMPP182, ISONE-WMPP184, and 14 more
15, BR item; you are not a member of that market. BR-CP-26-2026, BR-CP-25-2026, BR-CP-24-2026, BR-CP-23-2026, BR-CP-22-2026, BR-AP-6-2026, and 9 more
11, no issue type maps to your roles (gas_infrastructure). FR-2026-16237, FR-2026-16236, FR-2026-16065, FR-2026-15883, FR-2026-15695, FR-2026-15445, and 5 more
6, no issue type maps to your roles (hydro_licensing, gas_infrastructure). FR-2026-16435, FR-2026-15884, FR-2026-15780, FR-2026-15694, FR-2026-15693, FR-2026-15286
6, PH item; you are not a member of that market. PH-ORCP-WM-26-03, PH-ORCP-WR-WM-26-01, PH-ORCP-WR-WM-25-02, PH-ORCP-WM-24-06B, PH-ORCP-WM-24-06, PH-ADV-178
6, TR item; you are not a member of that market. TR-16428, TR-16426, TR-16425, TR-16424, TR-16427, TR-16422
5, no issue type maps to your roles (ferc_housekeeping). FR-2026-16324, FR-2026-16061, FR-2026-15690, FR-2026-15543, FR-2026-15540
5, WEM item; you are not a member of that market. _WEM-AEPC_2026_11, WEM-AEPC_2026_10, WEM-AEPC_2026_06, WEM-AEPC_2026_07, WEM-AEPC_2026_08_
4, EU item; you are not a member of that market. _EU-PC2026E08, EU-PC2026R09, EU-ENTSOE-copy-of-core_ccr_2025_survey_quality_of_the_data_p, EU-ENTSOE-ishm-assessment_
4, NZ item; you are not a member of that market. NZ-balance-point-principle-guidance, NZ-further-reform-of-distribution-connection-pricing, NZ-23-october-2025-under-frequency-event, NZ-improving-visibility-of-competition-in-the-otc-contract-market-consultation-on-updates-to-clause-216-notice
2, CL item; you are not a member of that market. CL-consulta-publica-sobre-modificacion-de-la-norma-tecnica-de-conexion-y-operacion-de-pmgd-en-instalaciones-de-media-tension, CL-consulta-publica-sobre-resoluciones-reglamentarias-asociadas-a-la-ley-n-21-721-de-2024-del-ministerio-de-energia-que-modifica-la-ley-general-de-servicios-electricos-en-materia-de-transmision-electrica
2, needs: exposed to large-load cost assignment, none apply to you. PJM-ISSUE-470A5F36-2CE2-4C82-8639-7D4BB9D0CAFC, PJM-ISSUE-A8029828-1E0E-4FAD-9B08-0ACD7E1553E1
2, WECC item; you are not a member of that market. WECC-0160, WECC-0157
2, SG item; you are not a member of that market. SG-CP99, SG-CP93
2, NORDIC item; you are not a member of that market. NORDIC-STATNETT-horing-om-oppdaterte-retningslinjer-for-utovelsen-av-systemansvaret-26-3, NORDIC-ENERGINET-uafhaengige-aggregatorer-h1-i-d1-c2-juni-august-2026
2, FR item; you are not a member of that market. FR-CRE-2026-13, FR-CRE-2026-12
1, no issue type maps to your roles (market_design, hydro_licensing). FR-2026-16239
1, IN item; you are not a member of that market. IN-DR-119
1, NL item; you are not a member of that market. NL-verzoek-tennet-goedkeuring-tot-eerste-wijziging-van-de-day-ahead-capaciteitsberekening-central-europe
1, no issue type maps to your roles (order_2222_opt_in). PJM-ISSUE-37263958-E87C-4C0A-83FB-3B492F5C21A9
1, no issue type maps to your roles (rec_sales). PJM-ISSUE-9379608B-7629-4622-8BBD-79F590B77A4D
1, ZA item; you are not a member of that market. ZA-national-energy-regulator-act-board-national-energy-regulator-south-africa-nersa
1, JP item; you are not a member of that market. _JP-260807_ikenboshu_2026saiene_
1, no issue type maps to your roles (large_load). NERC-2026-02